Our company is built on Integrity, Community & Trust
We Want To Help You Succeed
Veteran’s Parkway – Phase 1
(Jeffersonville and Clarksville, IN)
Veteran’s Parkway – Phase 1 (Jeffersonville and Clarksville, IN) – A new five-lane urban roadway with a Two-Way Left-Turn Lane (TWLTL) which serves as a north side connection between the City and Town. The 1.5 mile long project created a new interchange with I-65, which was constructed by INDOT. A new bridge overpass was constructed on a horizontal curve over U.S. 31 and the L&I Railroad and a two-way Connector Ramp was used to provide access to and from U.S. 31. The roadway included curb and gutter, sidewalk, and foundations with conduit for future decorative street lighting on both sides. New traffic signals were installed at three locations. The project also required substantial improvements on three side roads, and an at-grade railroad crossing with CSX was installed.
Project Details
CLIENT
Clarksville/ Jeffersonville Redevelopment Commission
Location
Clarksville & Jeffersonville, IN
Services Provided
- Design Services
- Bridge Design
- Streetscapes
- Traffic Engineering